Novapoint project for bypass - cable runs in the lighting system for the tunnel (550m) can be installed with more confidence because clashes will have already have been spotted. A special truck platform is used for the work. Kleppe bypass, Stavanger, Rog

Novapoint project for bypass - cable runs in the lighting system for the tunnel (550m) can be installed with more confidence because clashes will have already have been spotted A special truck platform is used for the work Kleppe bypass, Stavanger, Rogaland, Norway. (Photo by Adrian Greeman/Construction Photography/Avalon/Getty Images)
Novapoint project for bypass - cable runs in the lighting system for the tunnel (550m) can be installed with more confidence because clashes will have already have been spotted A special truck platform is used for the work Kleppe bypass, Stavanger, Rogaland, Norway. (Photo by Adrian Greeman/Construction Photography/Avalon/Getty Images)
Novapoint project for bypass - cable runs in the lighting system for the tunnel (550m) can be installed with more confidence because clashes will have already have been spotted. A special truck platform is used for the work. Kleppe bypass, Stavanger, Rog
COMPRAR LICENCIA
¿Cómo puedo usar esta imagen?
AR$ 208.500,00
ARS
Ten en cuenta lo siguiente: las imágenes que representan eventos históricos pueden contener temas, o tener descripciones, que no reflejan la comprensión actual. Se proporcionan en un contexto histórico. Más información.

DETALLES

Restricciones:
Póngase en contacto con su oficina local para conocer todos los usos con fines comerciales o promocionales.
Crédito:
Editorial n.º:
976620194
Colección:
Hulton Archive
Fecha de creación:
13 de marzo de 2008
Fecha de subida:
Tipo de licencia:
Inf. de autorización:
No se cuenta con autorizaciones. Más información
Fuente:
Hulton Archive
Nombre del objeto:
zb5350_241317_0704.jpg
Tamaño máx. archivo:
4085 x 4278 px (34,59 x 36,22 cm) - 300 dpi - 6 MB